SITE INFRASTRUCTURE PROGRESS REPORT

VIDEO PRESENTATION

Play Video

ATV SITE INFRASTRUCTURE

PROGRESS REPORT

Roads
1 %
ICT
1 %
street lights
1 %
Gas Pipelines
1 %
Fowl Sewerage
1 %
RIVER TRAINING
1 %
STORM SEWER DRAINAGE
1 %
Electrical cable networks
1 %
Portable and raw water pipes
1 %

1. Construction of Culverts Adjacent ITAR 15

2. Central Sewerage Treatment (STP)

3. Central Sewerage Treatment (STP) – Pumping Station

4. ITAR 11 Road Section being constructed

5. Drainage construction and Service ducts being installed

6. Water Pipe being laid from water tank